FAW HONGQI Weishan Final Assembly


Background:


l Cycle time: 64JPH


l Car model: T/B/E series, C001, D511


l Year of built: 2022


Scope of Supply as Turn-key:


l Chassis pre-assembly line- linear chain conveyor


l Marriage line- coupling/decoupling, bolting stations, linear chain conveyor


l Main pallet return line- heavy load pallet conveyor, overhead transfers


l Sub-pallets storage (multi-level)- racking system, stacker cranes


l Sub pallets circulating line- accumulated chain conveyor, robotic transfer


l Decking pallets, sub-assembly pallets


l The complete electrical control system


Technical Highlights:


l Fully-auto decking


l Auto bolting both servo and robotics


l Modularized pallet design, supports being exchanged automatically


l Highly flexible- 11 car models in production